Regenerative Resort CAPEX
Start your project →
EPIC CAPEX ESTIMATOR

Sense-check your
resort investment.

Estimate total CAPEX by blocks — cabins, infrastructure, public zones, soft costs and contingency. Built for EPIC-scale micro-resorts (not single backyard builds).

Illustrative only — a fast starting point for feasibility.
1 — ASSUMPTIONS
Keep it simple — refine later.
cabins / villas
Typical EPIC micro-resort: 10–40 keys.
Use your target mix average.
€ / m²
Turnkey unit cost proxy (editable).
utilities
€ / key
Power, water, wastewater, civil works (proxy).
€ / key
Furniture, fixtures, equipment (proxy).
Reception, lounge, F&B, staff, storage, etc.
€ / m²
Depends on finish level & MEP.
fixed €
Optional (leave blank if none).
access & terrain
Applies to: infrastructure + siteworks + logistics.
% of cabin CAPEX
Pads, roads, drainage, basic landscaping.
% of cabin CAPEX
Freight, cranes, remote complexity.
% of hard costs
Architecture, engineering, BIM, PM.
fixed €
Permits, legal, consultants (proxy).
% of hard + soft
Early-stage estimates typically use 8–15%. Higher for remote / off-grid.
Setting contingency to 0% can understate CAPEX materially. Consider 8–15% for early-stage feasibility.
Extras (optional)
Copied ✅

Please fill in all required fields with valid numbers.

This estimator is simplified. Real CAPEX depends on site conditions, specs, codes, and scope.

How to use this

Use this as a quick scope + budget alignment tool. If the result is in the right range, the next step is a deeper feasibility: land constraints, access, permitting, utilities, and a custom concept plan.

If you want to explore a fully custom EPIC resort, reach out and share your land and vision →